Description
During the construction of the Hilton canopy hotel there was a temproary crosswalk placed on Steuben. Now the hotel is open and a new crosswalk has been installed, the road was restriped, and new sidewalks and trees were installed so that the temporary crosswalk is obselete nor operable since there is now a tree planted at the end of the crosswalk and there is no ramp down. Unfortunately because it was never erased the parking authority continues giving tickets for anyone parked 25ft within the cross walk.....
also asked...
A. 3. Traffic: Roadway Striping Maintenance (For all requests to refresh faded roadway striping, including crosswalks, double yellow centerlines, stop bars and markings, lane arrows, etc. Requests are typically addressed within 3 to 6 months.
A. No Answer Given
6 Comments
Jersey City, NJ (Verified Official)
Acknowledged Traffic – Jennifer C (Verified Official)
Traffic – Jennifer C (Verified Official)
Engineering - Althea (Verified Official)
KathrynM (Registered User)
Engineering - Althea (Verified Official)
It sounds like the temporary crosswalk is now painted over, which would complete this request, but now a host of other issues have cropped up for this segment of Steuben and the intersection of Marin Blvd & Stueben. Is his correct?
It has taken us a long time to get to these issues and I want to be as precise as possible so I get the correct information to the engineers. The intersection of Marin and Columbus already has a ton of requests, so I do understand it is an area wide traffic issue. It's a lot and your help is appreciated more than you could know.