The water/sewer line work has been occurring on Stevens road since July of 2013. It seems to be dragging out unceremoniously. All the while, our street looks like a war zone due to mud/dirt, gravel, potholes, old road cones, and equipment, haphazardly left in different yards down the block. The progress on the street appears stalled with only a dozen or so houses left on the street.

What is causing the delay in this project, and when can we expect it to wrap up and have our street back to normal (simple pavement and curbs) like other taxpayers enjoy across other areas of Raleigh?


9 تعليقs

  • Emrys Treasure (مستخدم مسجل)

  • Stevens Rd resident (ضيف)

  • تم إقراره City of Raleigh 3 (تم التحقق رسميا)

  • Tricia B. (مستخدم مسجل)

  • Ed Stempien (ضيف)

  • Jessica (مستخدم مسجل)

  • Ed Stempien (ضيف)

  • مغلق City of Raleigh 3 (تم التحقق رسميا)

التعليقات مغلقة لقضايا المؤرشفة.