واعترف من قبل: Jersey City, NJ

Construction on Street/Sidewalk تم إقراره

4th St Jersey City, NJ, 07302, USA عرض على الخريطة إخفاء الخريطة
تحريك علامة لتمثيل موقع القضية الخاص بك. سوف عنوان لا يتغير.

مراسل صحفي

ID قضية:

15867002

Submitted To:

Construction Concerns

فئة:

Construction on Street/Sidewalk

شاهدوا:

153 مرات

حي:

Downtown

ذكرت:

في

الوصف

Metro Plaza construction site added extremely wide pedestrian walkway, taking over an entire traffic lane. The result is an extremely sharp jog in traffic lanes within the 4th Street/Marin intersection with a SB left turn lane. Bicycles will share the walkway with pedestrians. The southbound left turn lane has been reduced in length so only two vehicles can fit while waiting for on-coming traffic to lighten up to make the turn - causing a back up to the single southbound lane. At the north end of the construction site, it also has a jog with three lanes having to make the abrupt adjustments upon exiting or entering the intersection at Sixth Street. Vehicles travel at fast speeds, not always staying in the lane they should be in. It could be a matter of time with head on collisions or pedestrians scrambling to maneuver through the area.


تعليق جديد

تغييرات الحالة العامة غير متاحة لهذه المشكلة.