确认人: Jersey City, NJ

Construction on Street/Sidewalk 已确认

4th St Jersey City, NJ, 07302, USA 在地图上显示 隐藏地图
Move the marker to represent your issue's location. The address will not change.

报告人

问题 ID:

15867002

Submitted To:

Construction Concerns

类别:

Construction on Street/Sidewalk

已查看:

156 次数

社区:

Downtown

已报告:


说明

Metro Plaza construction site added extremely wide pedestrian walkway, taking over an entire traffic lane. The result is an extremely sharp jog in traffic lanes within the 4th Street/Marin intersection with a SB left turn lane. Bicycles will share the walkway with pedestrians. The southbound left turn lane has been reduced in length so only two vehicles can fit while waiting for on-coming traffic to lighten up to make the turn - causing a back up to the single southbound lane. At the north end of the construction site, it also has a jog with three lanes having to make the abrupt adjustments upon exiting or entering the intersection at Sixth Street. Vehicles travel at fast speeds, not always staying in the lane they should be in. It could be a matter of time with head on collisions or pedestrians scrambling to maneuver through the area.


发表新评论

15 评论s

  • Jersey City, NJ (官方验证)

  • KathrynM (注册用户)

  • 已确认 Infrastructure - Althea (官方验证)

  • KathrynM (注册用户)

  • Infrastructure - Althea (官方验证)

  • 关闭 Infrastructure - Althea (官方验证)

  • KathrynM (注册用户)

  • KathrynM (注册用户)

  • Infrastructure - Althea (官方验证)

  • Reopened Infrastructure - Althea (官方验证)

  • 已确认 Infrastructure - Althea (官方验证)

  • Alfonso (注册用户)

  • Infrastructure - Althea (官方验证)

新评论

无法将此问题更改为公开状态.