Mô tả
This construction project has been stalled for over a month or two. The sidewalk continues to be blocked excessively. Forcing pedestrians to walk in the bicycle lane 24/7
This construction project has been stalled for over a month or two. The sidewalk continues to be blocked excessively. Forcing pedestrians to walk in the bicycle lane 24/7
6 Bình luậns
Jersey City, NJ (Chính thức đã xác nhận)
Được thừa nhận Infrastructure - Althea (Chính thức đã xác nhận)
Đã đóng Infrastructure - Althea (Chính thức đã xác nhận)
Reopened KathrynM (Người dùng đã đăng ký)
Được thừa nhận Infrastructure - Althea (Chính thức đã xác nhận)
My apologies. We went out and checked and they have a permit to have the sidewalk closed until June. Pedestrians aren't supposed to use the bicycle lane, they are supposed to cross the street.
When asked for a timeline, the contractor hopes to clear the sidewalk completely by mid May.
Since this is all by the book and everyone is doing what they should, I thought this was resolved.
Đã đóng Infrastructure - Althea (Chính thức đã xác nhận)