الوصف
Monmouth at 6th Street
MUA contractor work completed but now the STOP line is gone.
Please have the STOP line repainted. If it’s too cold can we please have an additional STOP sign posted in the left side?
Monmouth at 6th Street
MUA contractor work completed but now the STOP line is gone.
Please have the STOP line repainted. If it’s too cold can we please have an additional STOP sign posted in the left side?
8 تعليقs
Jersey City, NJ (تم التحقق رسميا)
مغلق JCMUA - Sophia (تم التحقق رسميا)
فتح jz (مستخدم مسجل)
JC Village Mom (مستخدم مسجل)
JC Village Mom (مستخدم مسجل)
تم إقراره Engineering - Althea (تم التحقق رسميا)
Engineering - Althea (تم التحقق رسميا)
Traffic – Daniella G (تم التحقق رسميا)