Deskripsyon
Monmouth at 6th Street
MUA contractor work completed but now the STOP line is gone.
Please have the STOP line repainted. If it’s too cold can we please have an additional STOP sign posted in the left side?
Monmouth at 6th Street
MUA contractor work completed but now the STOP line is gone.
Please have the STOP line repainted. If it’s too cold can we please have an additional STOP sign posted in the left side?
8 Komentos
Jersey City, NJ (Beripikadong Opisiyal)
Isinara JCMUA - Sophia (Beripikadong Opisiyal)
Reopened jz (Rehistradong User)
JC Village Mom (Rehistradong User)
JC Village Mom (Rehistradong User)
Kinilala Engineering - Althea (Beripikadong Opisiyal)
Engineering - Althea (Beripikadong Opisiyal)
Traffic – Daniella G (Beripikadong Opisiyal)