Description
Monmouth at 6th Street
MUA contractor work completed but now the STOP line is gone.
Please have the STOP line repainted. If it’s too cold can we please have an additional STOP sign posted in the left side?
Monmouth at 6th Street
MUA contractor work completed but now the STOP line is gone.
Please have the STOP line repainted. If it’s too cold can we please have an additional STOP sign posted in the left side?
8 Comments
Jersey City, NJ (Verified Official)
クローズド JCMUA - Sophia (Verified Official)
Reopened jz (Registered User)
JC Village Mom (Registered User)
JC Village Mom (Registered User)
ADIは、 Engineering - Althea (Verified Official)
Engineering - Althea (Verified Official)
Traffic – Daniella G (Verified Official)