Descrizione
Monmouth at 6th Street
MUA contractor work completed but now the STOP line is gone.
Please have the STOP line repainted. If it’s too cold can we please have an additional STOP sign posted in the left side?
Monmouth at 6th Street
MUA contractor work completed but now the STOP line is gone.
Please have the STOP line repainted. If it’s too cold can we please have an additional STOP sign posted in the left side?
8 Commentos
Jersey City, NJ (Ufficialità verificata)
Chiusa JCMUA - Sophia (Ufficialità verificata)
Reopened jz (Utente registrato)
JC Village Mom (Utente registrato)
JC Village Mom (Utente registrato)
Riconosciuto Engineering - Althea (Ufficialità verificata)
Engineering - Althea (Ufficialità verificata)
Traffic – Daniella G (Ufficialità verificata)